济南大型广告牌冬季施工措施

页面更新时间:2015-09-18 10:50 来源:未知 作者:admin 点击:
1.粉刷施工要求外粉刷在入冬以前完成大部分,入冬后仅进行室内粉刷,粉刷前对门窗洞口予以封闭。
 
1. Paint for the construction of external plaster before winter completed most, after the winter only interior paint, painting of door and window openings shall be closed.
 
2.粉刷砂浆调制转入主体底层室内,砂浆保持正温。粉刷完成后的部位要加强养护,必要时加防冻剂。
 
2 paint mortar modulation into the bottom of the main body, the mortar is maintained at the temperature. After the completion of the site to strengthen the maintenance, if necessary, add antifreeze.
 
3.室外脚手、通道等处要做好防冻、防滑措施。
 
3 outdoor foot hand, channel and other places to do a good job of anti freezing, anti slip measures.
 
4.济南大型广告牌工地严禁明火,防止火灾。
 
4 large billboards in Ji'nan is prohibited from fire, fire prevention.
 
5.对于雨雪天气,要注意检查、保护好设备、施工用电。对施工电梯、脚手必须重新检查验收,合格后方可使用。<br/>
 
5 for rain and snow weather, should pay attention to check, to protect electric equipment, good construction. On the construction of the lift, the foot must be re inspection and acceptance, qualified rear can be used. <br/>
 
6.入冬时,要注意及时收集天气预报,尤其是日平均气温,若连续几天平均气温降到10℃以下,则应及时做好济南大型广告牌 http://www.gift4yu.com/ 冬期施工的各项准备。当平均气温达到0℃,最低-5℃时,对砼施工要采取蓄温法施工,届时,再视施工具体条件,制定详细冬施方案。
 
6. Winter, should pay attention to the timely collection of the weather forecast, especially in daily average temperature, if several consecutive days average temperature dropped to below 10 degrees centigrade, Jinan large billboards in winter construction of the be ready in time. When the mean temperature reached 0, the minimum -5, the concrete construction should be taken to the construction of thermal storage method, and then, as the construction conditions, formulate detailed plan.